P-1024 Navy V-22 Hangar
Project Description

The P-1024 Navy V-22 Hangar at Naval Base Coronado is a 132,000-square-foot, state-of-the-art maintenance facility purpose-built to support the U.S. Navy’s transition from the C-2 Greyhound to the advanced CMV-22B Osprey for Carrier Onboard Delivery (COD) missions. This two-story, steel-framed structure accommodates the operational and training needs of two CMV-22B squadrons—VRM-30 and VRM-50.

Project Specs
  • Location Naval Base Coronado, California



Miramar Peaker Plant
Project Description

The Miramar Peaker Plant, officially known as the Miramar Energy Facility Unit 2, is a 49.5-megawatt natural gas-fired peaking power plant located at Marine Corps Air Station (MCAS) Miramar in San Diego, California. The facility is centered around a high-efficiency GE LM6000 "New Generation" gas turbine and is designed to provide rapid-response electricity during periods of peak demand or grid instability, both for the base and the surrounding region.

Project Specs
  • Location San Diego, California



US Marine Corps BEQ Package 9
Project Description

BEQ Package 9 at the United States Marine Corps base is a large-scale, high-performance military housing project that encompasses the design/build of three 4-story Bachelor Enlisted Quarters (BEQs) totaling 576 two-person units—equivalent to 1,152 beds—along with supporting facilities that enhance both functionality and quality of life for service members.

Project Specs
  • Location Twentynine Palms, California



March Air Force Base - Airfield Control Tower and Ops
Project Description

The new Airfield Control Tower and Operations Facility at March Air Force Base, California is a 23,190-square-foot, 11-level, state-of-the-art structure designed to replace the base’s outdated 1958-era tower. Standing at 130 feet, the new tower significantly enhances the operational capabilities of the airfield and reflects a long-term investment in the sustainability and modernization of military infrastructure.

Project Specs
  • Location March Air Reserve, Riverside, California



Quality of Life Package 4
Project Description

The Quality of Life Package 4 (QOL 4) at Camp Pendleton is an $80 million, design-build military campus designed to enhance the daily living experience of single Marines while promoting sustainability, efficiency, and long-term operational readiness. Completed in June 2013, the project spans over 440,000 square feet and includes four 4-story Bachelor Enlisted Quarters (BEQs), each paired with a 9,825 SF multi-purpose building, a 21,480 SF dining facility seating 445, a 500-seat outdoor amphitheater, a 540-space parking structure, and a 420-foot Ninja Warrior-style obstacle course.

Project Specs