Baker Electric helped power a maritime milestone by delivering the custom charging infrastructure for Crowley’s eWolf, America’s first all-electric tugboat.
read more
Baker Electric is helping modernize nearly 18 miles of State Route 78 with Intelligent Transportation System infrastructure, including fiber optic communications, CCTV, ramp metering upgrades, signal improvements, highway advisory radio systems, and bridge lighting.
read more
Baker Electric is helping power the new Sharp Rees-Stealy Chula Vista Medical Center with reliable electrical infrastructure, on-site solar, and backup generator systems designed to support critical healthcare operations.
read more
At Bristol Myers Squibb’s San Diego facility, Baker Electric is helping deliver the infrastructure behind a highly coordinated life sciences environment, from underground conduit systems to backup power and sterilization support.
read more
Baker Electric is helping deliver a large-scale solar canopy system at ASML’s San Diego campus, supporting one of the region’s highest energy users with on-site renewable energy infrastructure.
read more